Skip to content
TechnoGuru — Think Technology, Think TechnoGuru

Consultation Prep Checklist

Drawings, site info and people to line up before the first conversation.

TechnoGuru / Consultation Prep

Advisory · live

Prepare for the first conversation

Tell us the project type, the systems in play and the stage. The panel assembles a checklist of drawings, site information and people to line up — copyable for your own notes.

Project type
New build or retrofit
Systems in playselect all that apply
Stage
Site visit or remote review

Your preparation checklist

Drawings & information to gather

  • A one-line description of what the space is for
  • Target timeline and key dates
  • Floor plans by level
  • Guest-room and public-area schedule
  • Architectural GA drawings
  • Reflected ceiling plans (RCP)
  • Electrical load schedule (if available)
  • Room / usage schedule for AV spaces
  • User counts and device density by area
  • Server / equipment-room location
  • Schematic drawings

People to involve

  • Architect / design consultant

Decisions to think through

  • Confirm a site-access window and a point of contact

Stage notes

  • At design stage we can review drawings and align systems early.

A preparation aid only. Share only drawings and information you are authorised to share, through proper channels. Final scope and design remain with the appointed consultants and authorities.

Consultation Prep Checklist — what it covers

The Consultation Prep Checklist assembles, from your project type, the systems involved and the stage, a checklist of the drawings, site information and people to have ready before talking to TechnoGuru. It helps the first conversation move quickly. The checklist is a preparation aid you can copy into your own notes — it is not a scope, a BOQ or a design.

Disciplines this tool can point to

What this tool does not do

What this tool does

The Consultation Prep Checklist assembles, from your project type, the systems involved and the stage, a checklist of the drawings, site information and people to have ready before talking to TechnoGuru. It helps the first conversation move quickly. The checklist is a preparation aid you can copy into your own notes — it is not a scope, a BOQ or a design.

  • When to use

    Just before you reach out, so the first conversation is productive.

  • When not to use

    As a substitute for a real scope, engineering or BOQ — it only helps you prepare.

What this tool does not do

  • Produce a scope, BOQ or quantities
  • Specify equipment, layouts or routing
  • Ask for sensitive security or fire detail
  • Replace the appointed consultants or a site survey
  • Make any approval or compliance determination

· Example use

A facilities lead preparing a corporate fit-out selects Corporate, New build, AV and IT systems, Design stage and a site visit. The checklist returns the floor plans, ceiling plans, user counts and equipment-room location to gather, the architect to involve, and the operations question to settle — copyable straight into a kickoff email.

· Frequently asked

Consultation Prep Checklist
what people ask first.

Why prepare a checklist before talking to you?

A short list of drawings and decisions, ready in advance, lets the first conversation focus on the project rather than on chasing information. It also helps you brief other consultants consistently.

What if I do not have drawings yet?

That is fine — at concept or retrofit stage a site visit or a sketch is often enough to begin. The checklist adapts to your stage and tells you what is most useful to share, only ever through proper channels.

Can I share the checklist with my team?

Yes — use the Copy button to take the assembled checklist into your own email, brief or project notes. Share only drawings and information you are authorised to share.

Is this a quote request?

No. It is a preparation aid. When you are ready, the Architect Brief Builder turns your inputs into a coordination brief, or you can talk to the studio directly.

· Begin

Checklist ready?
Start the conversation.

The first reply will come from a project lead, not a sales gateway, within two working days.

Consultation Prep Checklist — What to prepare | TechnoGuru