Skip to content
TechnoGuru — Think Technology, Think TechnoGuru

· Specification starter  /   Auditorium / cultural hall

Auditorium / cultural hall
scope outline.

Front-of-house line array, stage lighting fabric, broadcast-grade AV, acoustic envelope and assistive-listening loop. Ceremonial-grade calibration.

In scope

Line-array loudspeaker design sized to seat geometry • Stage lighting fabric (DMX with manual fallback) • Broadcast AV with SDI / NDI tally • Assistive-listening loop per occupancy • Recording bus on independent UPS

Out of scope

Acoustic treatment construction (separate civil + acoustic scope) • Seating supply • Stage furnishing and curtains beyond AV-relevant items

· Documents required

Materials the consultant needs before specification starts.

  • Architect's acoustic envelope drawings

  • Seat plan with section AA / BB sightlines

  • Ceremonial use brief (event types, occupancy peaks)

  • Broadcast intent (live / record / hybrid)

· Site survey

Pre-design walk-through verifications.

  • Acoustic measurement at the as-built state (RT60, reverberation curve)

  • Sightline survey from worst-case seats

  • Stage power audit (load, isolation, UPS)

· Deployment checklist

Engineering items every install of this discipline carries.

  • Line array sized for the actual seat geometry, not the catalogue

  • RT60 ≤ 1.5 s with audience present for the room class

  • Stage lighting on DMX with manual fallback

  • Recording bus on independent UPS — survives stage power-cycles

  • Assistive-listening loop per accessibility requirement

· Coordination with other trades

Works owed to / from other disciplines.

  • Civil / acoustic: treatment surfaces against the speaker placement

  • Fire: BGM override on the fire-alarm general signal

  • Networking: AV-over-IP VLAN + PTP timing

  • Power: dedicated UPS rails for control, recording and house mixers

· Commissioning

Measurable artefacts produced at handover.

  • SPL measurement at every section's worst-case seat

  • STI measurement under design-occupancy conditions

  • Stage lighting cue rehearsal

  • Recording bus power-cycle survival test

  • Assistive-listening loop calibration

· Handover

What the building team takes ownership of.

  • Measured-performance commissioning report

  • DSP and matrix configuration baseline

  • Stage lighting cue files

  • Operator training and rehearsal log

· Risk register starter

Risks worth tracking from day zero.

  • Audience occupancy changing room acoustic response from design

  • Stage power cycling damaging the recording bus

  • Brand-firmware refresh breaking the calibration baseline

· Exclusions and assumptions

What is not in scope; what we assume to be true.

  • Assumes acoustic treatment delivered as a separate civil scope

  • Excludes broadcast licensing and rights management

Auditorium / cultural hall — specification starter | TechnoGuru