Fire & Life-Safety Compliance

NBC 2016, state gazette rules and IS-code-backed checkers.

Compliance is the first conversation on a serious project — long before the first fixture is specified. The tools in this category resolve building height, occupancy class and state-specific gazette overlays against the National Building Code 2016 baseline.

Every output cites the relevant code (IS 2189 detection, IS 15105 sprinkler, IEC 60849 / EN 54-16 voice evacuation, the hydrant/wet-riser provisions of NBC 2016 Part 4) so the result is defensible at a first conversation with the architect, the fire officer or the AHJ.

02 / In this category

6 tools, sized for
fire & compliance.

Full toolkit
01Readiness

Fire Readiness Checklist

A readiness self-check before a fire alarm, hydrant or extinguisher conversation. No device counts, layouts, zoning or NOC/AHJ pass/fail — design and approvals stay with the fire consultant and the authority.

Advisory · readinessOpen tool
02Fire · C&E

Fire Alarm + PA Cause-and-Effect Planning Checklist

A methodology-level readiness check for planning a fire alarm + PA / voice-evacuation cause-and-effect matrix — the interface items to cover, the inputs to prepare and who owns each. No interlock logic, device counts or statutory verdict.

Advisory · planningOpen tool
03ELV · Surveillance

CCTV Coverage Calculator

Building dimensions and risk profile in, recommended camera count, retention storage and bandwidth out. Sized to NBC and IS-grade specifications.

Cameras · TB · MbpsOpen tool
04Life-safety

NBC Compliance Checker

Building height, type and occupancy in — list of mandatory life-safety and ELV systems out, citing NBC 2016 and the relevant IS codes.

NBC 2016 · IS codesOpen tool
05Life-safety · 28 states + 8 UTs

NBC Fire-Safety by State

State or union territory, building height and occupancy in — list of sprinkler, addressable FA, voice-evac PA, wet-riser and Fire-NOC triggers out, with explicit source-status tiering across all 28 Indian states and 8 union territories.

NBC 2016 · state ruleOpen tool
06Fire · NBC · Zoning

Sprinkler Zoning Planner

Building height, occupancy and hazard class in — recommended sprinkler zone count, riser strategy, valve room count and reference NBC clause out. Brief-stage planning only — not a fire-engineering submission.

zones · risers · clausesOpen tool